This was just after finishing the refit and maintenance work done in Port de Peche, Monastir.
The work done included
- bow modification: reverse bow to increase waterline, reduce pitching and give a modern look
- construction of hard-top
- total engines and sail drive refurbishment
- forward port cabin changed into workshop
- signwriting and antifouling.
Port de Peche is a fishing harbour with a 150T boatlift. It is government, operated, cheap and very dirty, so it was a great relief to come back to the Monastir Marina!!!